双插性欧美一二三区双-国产一区二区不卡区-国产伦精品一区二区三区视频网站-中文字幕欧美另类精品亚洲-亚洲激情三级视频在线看-免费在线观看视频专区-嫩草影院未满十八岁禁止入内-高潮流白浆视频在线观看-男人鸡巴日女人逼黄色视频

200kW Input/AC; 480kW/Output/DC; 1200kW Charging Capacity

Overview Features Downloads

Zhiguang integrated super energy storage and EV charging system, built on a DC bus architecture, combines an LFP BESS, a 480kW fast charging pile system, and photovoltaic MPPT. It leverages an EMS for both local and remote intelligent management. Equipped with multiple energy dispatch algorithms, it efficiently balances energy supply and demand among the power grid, storage units, and electric vehicles. By optimizing the price differential between peak and off-peak periods and maximizing limited grid capacity, the system ensures efficient energy utilization and can supply power back to the grid when needed. Its modular design minimizes space requirements, simplifies installation and maintenance, and allows flexible deployment in various settings such as parking lots, commercial centers, and residential neighborhoods.
  • Bidirectional AC/DC Power Modules: Utilize two 100kW bidirectional AC/DC power modules as needed
  • Centralized Charging Converter: Implement a centralized charging converter module with automatic scheduling, supporting up to 480kW super-fast charging
  • DC Bus Architecture: Integrate energy storage, charging piles, and photovoltaic (PV) systems using a DC bus architecture
  • Enhanced Output Efficiency: Deliver higher output with lower input when transformer capacity is insufficient